Use Autodesk Forma throughout the design process to inform your architecture with environmental data rather than using it as a final decorative step. By letting performance metrics guide your massing decisions, you can create a more sustainable project and a more compelling competition entry.
Hi All,
Today’s Buildathon tip is all about using Forma Analysis to INFORM design, not to decorate it.
One of the most common mistakes in student design competitions is treating software analysis as a "post-processing" step. Many teams design their entire project in a vacuum, generate final renderings, and then run environmental analyses at the last minute just to add colourful diagrams to their presentation boards.
Do not treat analysis as decoration
In a world facing unprecedented climate challenges, true sustainability cannot be retrofitted onto an inherently flawed massing. The jury will easily spot "greenwashing" boards where the narrative does not match the geometry. Instead, use Autodesk Forma as an active design partner from day one.
1. Run your analysis at the start
Run your initial microclimate, wind, and solar analyses on basic block massing before you ever draw a single wall or window in Revit.
• Is your outdoor community plaza trapped in a permanent wind tunnel?
• Is your main lobby completely shaded during winter peak hours?
Finding these answers in hour one saves you weeks of modeling rework.
2. Use results to modify proposals
Let the data reshape your architecture. If your Forma wind analysis reveals high-velocity discomfort zones at the entrance of your hub, use that information to modify the proposal:
• Twist or taper the building massing to deflect incoming wind streams upward.
• Carve out a podium or add canopies to disrupt downdrafts before they reach pedestrian levels.
• Create a courtyard configuration to shield outdoor public gathering spaces.
3. Explain WHY changes were made
Your design presentation should tell a story of evolution driven by data. The jury wants to see your failures just as much as your successes—provided those failures led to smarter design choices.
Show the original massing, display the negative analysis result, and then show the modified proposal alongside its improved performance metrics. Proving why your building looks the way it does because of environmental data is exactly how you build a winning competition entry.
Wishing you all luck in your preparations in the final weeks before the competition on August 18